The exhaust gases from the engine pass through the exhaust manifold and into the TWC. The TWC is composed of a ceramic honeycomb structure coated with a thin layer of precious metals such as platinum, palladium, and rhodium.
As the exhaust gases pass through the honeycomb structure, the precious metals catalyze a series of chemical reactions that break down the pollutants. CO is converted to CO2, HC is oxidized to CO2 and H2O, and NOx is reduced to N2 and H2O.
The Toyota Land Cruiser Prado 3400 middle catalyst is an essential component of the vehicle's emission control system, helping to ensure that it meets the required emissions standards. Regular maintenance and inspection of the TWC can help to prolong its lifespan and ensure that it continues to operate effectively
Carfitment | ||||
OE NO. | Car Fitment: | Mold | Year: | |
17410-75360 | LAND CRUISER PRADO (_J12_), LAND CRUISER PRADO (_J15_), LandCruiser | 3.0 D-4D (KDJ120_), 3.4, 3.0 D-4D (KDJ120, KDJ125), 3.0 D (KZJ120_), 3.0 TDi (KDJ150_), 2.7 (TRJ150_, TRJ155_), 3.5 (GRJ152_), 3.0 D-4D (KDJ155_, KDJ150_), -, 2.8 D-4D (GDJ155) | 2009-, 2020-, 2002-2009, 2005-2014 | |
Product name | LAND CRUISER PRADO (_J12_), LAND CRUISER PRADO (_J15_), LandCruiser | |||
Model Number | DJN162 | |||
Brand Name | DJN | |||
Emission Standard: | EURO 2/3/4/5 | |||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | |||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | ||||
Oxygen sensor ports | Yes | |||
cpsi | 400 /600/800 | |||
Wall thickness | 0.09±0.025 | |||
Warranty | 30000 miles performance/2 years | |||
Packaging: | Air bubble film and Carton Packing | |||
MOQ: | 50 pcs | |||
Supply Ability | 1000 Piece/Pieces per Week | |||
Place of Origin: | Jiangsu | |||
SAMPLE ORDER: | Accept | |||
Condition | new | |||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | |||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | |||
Supply Ability | 1000 Piece/Pieces per Month | |||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | |||
Port | Shanghai/Ningbo | |||
Lead time: | 10-30 days . | |||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | |||
Shape | round, oval, race track |